Kunshan PVC pipe Today's municipal works, many of the building's water pipeline, and various types of water conservancy projects and gas transmission projects will be used in such areas of the pipe, the state is very supportive of the use of plastic pipe, so now these products Demand is now very large. The development of plastic pipe industry has been more than 10 years of history, the industry standard is also more and more perfect, but the quality requirements of the use of pipe and the previous is a higher level.
According to the current actual situation, the development of plastic pipe fittings large-scale trend, so the injection molding machine equipment also has more requirements.
1, the equipment of the screw in the processing of raw materials, we must meet the special characteristics of the pipe.
2, in the molding process, be sure to accurately control the temperature changes in raw materials, so that the temperature is more uniform, the temperature of the plastic molding process is very large.
3, according to the processing time of the various types of special materials used in the characteristics of the injection molding machine for sol, injection and mold clamping operation, must have the appropriate intensity and speed, but also to accurately awaken control, adjust them More convenient.
4, to be prepared in the injection molding machine when used to produce various types of auxiliary equipment and auxiliary interfaces, such as the desiccant power interface, water separator and so on.
5, but also to install energy-saving devices, reduce production time consumption of energy, reduce costs and achieve the purpose of energy-saving emission reduction.
Injection molding machine for the new requirements, the future will continue to change, because the market will be the requirements of plastic products is constantly changing, to produce more in line with the market of plastic products, the first injection molding machine to meet production requirements.