UPVC water pipe manufacturers in Shaanxi PVC pipe installation should have a certain operating conditions, the construction staff should be familiar with the drawings, familiar with the relevant national or industry acceptance norms and standard drawings.
1, the basic completion of civil engineering foundation, the ditch has been dug according to the drawings required, its location, elevation, slope in line with the inspection process requirements, ditch base for the corresponding treatment and has reached the construction requirements of strength.
2, concealed pipeline (including equipment layer, shaft, ceiling pipe) should first check the elevation of a variety of pipes, coordinates of the arrangement of whether the contradictions. Reserved holes, embedded parts have been completed with. Civil construction template has been removed, the operation site clean, the installation height should be over 3.5m shelf.
3, PVC pipe manufacturers that the floor of the drainage pipe installation should be separated from the construction of 1 to 2 layers, and the pipeline through the structural parts of the hole has been set aside, indoor templates and debris removed after the room pop-up room size line and Accurate horizontal lines.
4, foundation and through the wall of the hole has been in accordance with the drawings of the location, elevation and size of a good reservation.